Running Your Prototypes Like a Portfolio
Hits come from volume and discipline, not one perfect idea. Here is how to plan prototypes like a portfolio, with a yearly count, a cost cap per test, and clear rules for when to double down.

How many prototypes does it take to make a hit? There is no fixed number, but most publisher-track teams plan for dozens of tests a year, expecting most to fail and a few to earn a second round. Treat prototypes like a fund: cap each bet, kill fast, and back the few that show signal.
Why a portfolio beats a single big bet
Hyper-casual and hybrid-casual publishing runs on low hit rates. Publishers have said openly for years that only a small share of the prototypes they test go on to scale. Your own numbers will be similar, whatever your skill.
That changes the question. Instead of asking whether this idea is good, ask whether your process gives enough ideas a fair test each year. A team that tests 30 prototypes with clean data has far more chances than a team that polishes six.
A fund manager thinks the same way. Most bets lose, a few return the fund. The skill is in sizing bets and cutting losers early.
Set your yearly volume
Work backwards from your capacity. Here is an illustrative planning example, not a benchmark:
| Input | Example value |
|---|---|
| Build time per prototype | 7 days |
| Working weeks per year | 46 |
| Parallel tracks | 1 |
| Prototypes per year | about 40 at full pace |
| Realistic after reworks and holidays | 25 to 30 |
Run your own version. If the number comes out under ten, the problem is speed, not ideas. Our seven-day prototype process shows how to get build time down.
Cap the cost of each bet
A portfolio only works if no single bet can sink you. Set a hard ceiling per prototype, covering build time, art and the creative test.
- Build cap. A fixed number of days. When you hit it, you test what you have.
- Creative cap. A set number of ad videos per test, made to a template.
- Test spend cap. Many publishers fund the CPI test themselves. If you pay, fix the amount before you see results.
CPI means cost per install, what you pay in ads for each person who installs. Treat the test budget as a fixed cost of entry, not something to top up when early numbers look close.
The most expensive prototype is the one you keep adjusting because it nearly worked. Close calls should go to the next round as a fresh, planned bet, not a slow drip of extra days.
Stage the bets
Fund managers invest in rounds. Do the same. Each round costs more and needs stronger proof.
- Round 1, marketability test. A short build and a few creatives. The question is whether people tap the ad and install cheaply.
- Round 2, retention check. A deeper build, maybe five to ten minutes of play. The question is whether players come back the next day, called D1 retention.
- Round 3, soft launch. Meta systems, monetization, more content. The question is whether the game can earn back what it costs to acquire players.
Most prototypes should stop at round 1. That is the system working, not failing. Write your pass bar for each round before the test, using the numbers your publisher shares with you.
Spread the risk across mechanics
A good portfolio is diversified. If every prototype is a runner game, one shift in the market hits them all.
Track each prototype by genre, core mechanic and visual hook. Every quarter, look at the spread:
- Too many in one genre? Swap the next two for something different.
- One mechanic keeps getting close? Run two variations of it on purpose.
- Visual hooks all similar? Your ads may be competing with each other.
The hybrid-casual shift adds a second axis. Some prototypes should test a pure hook, others a hook with a light meta layer from day one.
Keep a clean ledger
You cannot run a portfolio you cannot see. Keep one sheet with a row per prototype and the same columns every time.
| Column | Why it matters |
|---|---|
| Mechanic and genre | Spot patterns and gaps |
| Days to build | Track speed over time |
| Test result per metric | Compare like with like |
| Round reached | See your funnel |
| Kill reason in one line | Learn without rereading notes |
After 20 rows, the sheet starts telling you things. You will see which mechanics test well for you and which hooks you overrate. Our prototype test report template is a good starting format.
What we would do
We would plan the year first: a target count, a fixed build window, and a cost cap per bet. Then we would run round 1 tests on most ideas, move only clear passes to round 2, and kill everything else the same week.
Every quarter we would review the ledger for spread and patterns. When something reaches round 3, we would put real time and money behind it, because that is the bet the rest of the portfolio was paying for.
The short version
- There is no magic number, but expect most prototypes to fail and plan for volume.
- Work out your yearly count from build time and capacity, not hope.
- Cap the build days, creatives and test spend for every prototype.
- Fund in rounds: marketability, then retention, then soft launch.
- Spread bets across genres, mechanics and visual hooks.
- Log every test in one ledger and review it each quarter.
Count how many prototypes you tested in the last twelve months and set this year's target. If you need more shots on goal without more hires, talk to us.
Related reading: Prototype graveyard: six mechanics, Kill a prototype before the test, Ideation: 20 concepts a month