Process

Moving a Game From a Studio to Your Own Team

Bringing a game in-house after a studio built it is a planned handover, not a single day. Here is the order to do it in, how long to overlap, and what to check before the studio steps back.

Vectra Play 6 min read
A small office team gathered around a monitor while a developer on a video call walks them through code

To transition game development in-house, plan it as a staged handover over two to three months, not a single switch. Secure your accounts and repository first, hire a technical lead before the rest of the team, then run an overlap period where the studio and your hires work side by side until your team ships a build alone.

Why founders make the move

Bringing a game in-house is a normal step, not a sign anything went wrong. Many founders use a studio to get to launch or soft launch, then build a team once the game has players and the roadmap is long.

The reasons are usually commercial. A live game needs steady updates for years, and a permanent team becomes cheaper per month than a studio at that point. Investors also tend to want core capability inside the company before a larger round.

The risk is the gap. If the studio leaves before your team understands the code, updates slow down at the moment players expect them most. A planned overlap closes that gap.

Step 1: secure what you own

Before any hiring, make sure everything sits in your name. This takes days, not weeks, and it protects you whatever happens next.

Our post on a clean handoff when the build ships has a fuller checklist. If any of these sit with the studio today, move them first and tell the studio why. A good partner will expect it.

Step 2: hire the technical lead first

Your first hire should be someone who can read the codebase and judge it. Hire a lead engineer or technical director before anyone else, and give them two to four weeks with the code and the studio.

That person tells you what the next hires should be. They may find the game needs a backend engineer more than another gameplay programmer. Hiring the full team before they look is how founders end up with the wrong skills.

Ask your new lead for a written assessment after their first month: what is solid, what is fragile, and what they would change first. It is useful for you and for your board.

Step 3: run an overlap period

The overlap is where knowledge actually moves. Plan for it in the budget, because it means paying for both teams at once for a while.

PhaseStudio roleYour team role
Weeks 1 to 2Builds and ships as normalReads code, shadows reviews
Weeks 3 to 6Pairs on tickets, reviews your team's workTakes small tickets end to end
Weeks 7 to 10Reviews and answers questionsOwns most features and releases
After handoverOn call for a fixed number of hoursOwns everything

The timings are an illustrative plan, not a rule. A small casual game might need six weeks. A live game with a backend and events might need three months.

Step 4: transfer the knowledge that is not in the code

Code shows what the game does. It rarely shows why. Ask the studio for a handful of documents and sessions before they step back.

  1. Architecture overview, one or two pages, with a diagram of the main systems.
  2. Build and release guide, covering every step from commit to store submission.
  3. Known issues list, including the hacks and the reasons for them.
  4. Third-party list with every SDK, its version and its account owner.
  5. Recorded walkthroughs of the trickiest systems, such as save data or the economy.

Recorded sessions are worth more than they cost. New hires join later and still benefit.

Step 5: define the handover finish line

Agree on what done means before the overlap starts. Without that, handovers drift for months.

A clear finish line looks like this: your team has shipped at least one update to the stores without studio help. They fixed a production bug on their own. Their lead signed off on the build and release guide as accurate.

When those are true, move the studio to a small support retainer for a set period. That gives your team a safety net without paying for capacity you no longer need.

Talking to the board about it

Investors will want to know the cost and the risk. Present it as a plan with phases, a budget for the overlap, and a date for the finish line.

Show the monthly cost before, during and after. The overlap months will be higher, and saying so upfront avoids a surprise in the next update. Our guide on reporting game progress to investors covers the format.

What we would do

We would secure every account and key in week one, then hire one strong technical lead and give them a month with the code before hiring anyone else. We would budget for an overlap of six to ten weeks and agree a written finish line with the studio before it starts.

Most of all, we would keep the studio on a small support arrangement for a few months after handover. Production bugs do not wait for your team to feel ready.

The short version

Write down who owns each account today and fix any gaps this week. If you want a studio partner that plans the handover with you from day one, get in touch.

Related reading: In-house vs outsourced team burn math, Technical due diligence on a game build, Hire or rent a game producer

#Process#Hiring#Studios#Planning#Ownership