Writing Acceptance Criteria for Game Milestones
A milestone is only as clear as its acceptance criteria. Here is how to write sign-off rules both you and your studio can test, with a template and the vague phrases to remove.

Game milestone acceptance criteria are the specific, testable conditions a build must meet before you sign off and pay. Good criteria name the features, the devices, the performance bar and the bug limits in words both sides can check in an afternoon. Write them before the milestone starts, attach them to the contract, and test against them together.
Why acceptance criteria protect your runway
Milestone payments are usually your biggest cash commitments. Without clear criteria, "done" becomes a matter of opinion, and opinions turn into delays, disputes and awkward board updates.
Clear criteria help the studio too. They know exactly what to deliver and when they will be paid. That clarity is one of the best predictors of a calm project. Our guide to structuring milestone payments covers how criteria fit into the payment plan.
If two reasonable people could disagree on whether a criterion is met, it is not a criterion yet.
What good criteria look like
Each criterion should pass four simple tests.
- Observable. Someone can see or measure it on a real build.
- Specific. It names the feature, the screen or the number.
- Agreed in advance. Written before work starts, not after delivery.
- Proportionate. It matches what this milestone is meant to prove.
A criterion that fails any of these needs rewriting before it goes into the contract.
Vague versus testable
Most problems come from phrases that sound clear but cannot be checked. This table shows common examples and better versions.
| Vague | Testable |
|---|---|
| Game runs smoothly | Holds a steady frame rate on the two agreed test phones during levels 1 to 10 |
| Tutorial is complete | A new player finishes the tutorial with no text help in under two minutes |
| Art is final | All characters and UI listed in the art sheet are in the build at final resolution |
| No major bugs | No crash or progress-blocking bug in a 30-minute play session on each test device |
| Monetisation works | Rewarded ads show in test mode and grant the reward every time |
The frame rate and device names are examples. Pick numbers and phones that fit your game and audience, and agree them with the studio.
A template you can reuse
Every milestone can use the same five sections. Fill them in during planning.
1. Features in scope
List each feature with one sentence on what "working" means. Anything not on the list is out of scope for this milestone.
2. Devices and platforms
Name the exact test devices, including at least one modest Android phone. Name the operating system versions too.
3. Quality bar
- Frame rate target on each test device.
- Load time to first playable screen.
- Build size limit, if relevant.
4. Bug limits
Agree severity levels in plain words. For example, zero crashes and progress blockers, and an agreed small number of cosmetic issues logged for the next milestone.
5. Sign-off process
Who tests, how long the review window is, and how feedback is returned. A window of a few working days is common. Our post on giving feedback on game builds helps here.
Running the sign-off
Criteria only work if the review is structured. Set a simple routine.
- The studio delivers the build with a short note mapping each criterion to where it can be checked.
- You or your tester go through the list on the named devices.
- Each criterion is marked pass, fail or minor issue, with a screenshot or video for any fail.
- Failures go back with a fixed retest date. Minor issues roll into the next milestone.
Keep the record. It becomes the history your board, a future studio or a new engineer can rely on.
One more habit helps. Close each sign-off with a short written note that lists what passed and what rolls forward. That note is what you forward to investors when they ask how the build is going, and it saves you writing a separate update.
Handling grey areas
Some things stay subjective, especially game feel and art direction. Handle them separately rather than pretending they are testable.
Agree a reference for each one, such as a target game for feel or an approved art sample. Then hold a short review call where both sides compare the build with the reference. Record the outcome in writing.
What we would do
We would write acceptance criteria for every milestone during the discovery phase, before the first payment. Each milestone would have one page using the five-section template.
We would ask the studio to draft the first version. Their draft shows how they think about quality, and editing a draft is faster than writing from scratch. Then we would agree every change in writing and attach the final page to the contract.
The short version
- Acceptance criteria are testable sign-off rules tied to each milestone payment.
- Make every criterion observable, specific, agreed in advance and proportionate.
- Replace vague phrases with named devices, numbers and screens.
- Use the five sections: features, devices, quality bar, bug limits, sign-off process.
- Treat feel and art direction as reference-based reviews, not pass or fail tests.
If you want help turning a milestone plan into criteria both sides can sign, talk to us.
Related reading: Your First Milestone Is Wrong: Structuring Payments That Protect Both Sides, Milestones and Payments: How Paying a Game Studio Works, How Game QA Actually Works, and Why It Is Not Optional
Got a game idea? We build it.
You bring the concept. We design, build, test and launch it, and you own 100% of the finished game.
Share Your Game Idea →